S2C Construction Updates - September 22, 2021

Image
Attendees: Preston Neill, Town of Ridgway Brian Kail, Stryker and Company Mark Clutts, Stryker and Company Leo Perez, Stryker and Company Brian Kail presented the 3-week schedule, pictured below:] On September 28th, the storm detention structure is scheduled to be set, requiring SMPA to shut down power in that immediate area. The structure will sit below power lines and a crane will be setting it in place. Per OSHA, the power needs to be shut off to complete this work. SMPA has already been communicating this system outage to area residents.  Stryker continues to work with the Town to navigate some issues getting the storm water service/system in place, specifically from the corner of Cora St. and Charles St over the east-west alley between Charles St. and Clinton St.   On October 11th, a gas meter and gas line will be installed to the Space to Create property.  Stryker is hoping to have the steel fabrication arrive by the end of October. Some underground plumbing has already gone in s

S2C Construction Updates - August 25, 2021

Image
Attendees: Brian Kail, Stryker & Company Mark Clutts, Stryker & Company Leo Perez, Stryker & Company Diedra Silbert, Town of Ridgway Preston Neill, Town of Ridgway The crew has been making great progress, highlighted by stair tower B going up.  The crew will start pouring all the foundations around stair tower A and then backfilling by the end of the week.  The masons will move from stair tower B to stair tower A late next week.  Stryker is planning to meet with reps from SMPA to discuss the electrical work that needs to be done, as well as the boxes that need to be laid in the right-of-way.  Stryker explained that a series of street and alley closures will be needed for various work in the Town right-of-way. Brian Kail said Stryker will soon begin communicating with area residents about these closures (with Town assistance), including timelines and impacts. Below is a list of durations for installing the storm water underground piping from Charles St. up Cora St. down the

S2C Construction Updates - August 12, 2021

Image
Attendees: Brian Kail, Stryker & Company Diedra Silbert, Town of Ridgway Preston Neill, Town of Ridgway The crew has been working on Stair tower B, which is located in the northeast corner, and they are getting ready for laying the underground utilities. Backfill will start going in on Tuesday, August 17th.  The footers have been laid out over at Stair tower A, which is located in the southeast corner. Forming will start on Monday, August 16th. Then, the crew will prepare to place concrete and get the walls erected.  The structures for the storm water system will be installed very soon. A plan will be developed next week to go about installing the water detention/sub-surface manifold, the storm detention box, and other materials. Storm pipes will be installed running east down the alley. Notices will be put out to area residents informing them of the upcoming work of storm water system installment and the need to close the alley. The aim is to provide a two week notice.  A Revocabl

S2C Construction Updates - July 28, 2021

Image
Attendees: Brian Kail, Stryker & Company Mark Clutts, Stryker & Company Leo Perez, Stryker & Company Diedra Silbert, Town of Ridgway Preston Neill, Town of Ridgway Ilene Bilenky The crew has started the foundation form work. A shipment of rebar is expected to arrive tomorrow. Stryker is hoping to pour foundations on Monday, August 2nd. Excavators are currently working on the northeast corner of the site. Starting on Monday, August 2nd, the structures for the storm water system will be installed. Containment pipes will go in first. The water detention/sub-surface manifold and storm detention box will be put in on the site, with storm pipes running east down the alley to Cora St., then turning north along Cora St. to the intersection of Cora St. and Charles St. The Town is currently working to pothole utilities at that intersection and later this summer or early fall will run a storm pipe across Charles St. so that water can get across. An image of the updated project schedul

S2C Construction Updates - July 12, 2021

Image
  Topic: Bi-Weekly Space to Create Project Update with Stryker & Company         Join Zoom Meeting https://us02web.zoom.us/j/81166252778?pwd=VEIvVWZOYllwSXY5ajRBZzhralY2UT09  Meeting ID: 811 6625 2778 Passcode: 778450 Dial by your location         +1 346 248 7799 US          +1 312 626 6799 US Attendees: Brian Kail, Stryker & Company Mark Clutts, Stryker & Company Leo Perez, Stryker & Company John Clark, Mayor Preston Neill, Town of Ridgway Geopier foundation work was completed on Friday, July 9th. The geopier equipment is being hauled out now.  The building's fire service and water service are going out for redesign.  The excavation work for the foundation has started. In about two weeks, the footers will be put in and concrete will be poured.  The materials for the storm detention system are on order and some have already been received.  An image of the project schedule was shared. It can be seen below.  Laura St. between Clinton St. and Cora St. has been turned i

S2C Construction Updates - June 30, 2021

Image
  Topic: Bi-Weekly Space to Create Project Update with Stryker & Company         Join Zoom Meeting https://us02web.zoom.us/j/81166252778?pwd=VEIvVWZOYllwSXY5ajRBZzhralY2UT09  Meeting ID: 811 6625 2778 Passcode: 778450 Dial by your location         +1 346 248 7799 US          +1 312 626 6799 US Attendees: Mark Clutts, Stryker & Company Leo Perez, Stryker & Company Liz Teitz, Ouray County Plaindealer Matt McIsaac Cat Lichtenbelt Preston Neill, Town of Ridgway Diedra Silbert, Town of Ridgway Andrew Michaelson, Artspace Geopier foundation work, which was supposed to take place the week of June 21st, will begin tomorrow (July 1st). Excavation equipment has already mobilized on the site. Gravel we be compacted into the ground and the work will be loud. There is also a good deal of vibration that comes with this type of work but it should not be felt more than 20 feet away from the hole.  Aggregate is being imported to the site. This will be happening through next week. Once the g

S2C Construction Updates - June 16, 2021

Image
  Topic: Bi-Weekly Space to Create Project Update with Stryker & Company         Join Zoom Meeting https://us02web.zoom.us/j/81166252778?pwd=VEIvVWZOYllwSXY5ajRBZzhralY2UT09  Meeting ID: 811 6625 2778 Passcode: 778450 Dial by your location         +1 346 248 7799 US          +1 312 626 6799 US Attendees: Mark Clutts, Stryker & Company Brian Kail, Stryker & Company Leonardo Perez, Stryker & Company Cat Lichtenbelt Preston Neill, Town of Ridgway Construction fencing has been erected at the job site and around the staging lot, and earthwork has started.  Strkyer and the Town recently worked through an issue that arose related to the construction fencing encroaching into the Town alley located directly to the west of the project site. Next week (week of June 21st), the geopiers are scheduled to go in. Excavation equipment will go onto the site and gravel we be compacted into the ground. The geopier system is a ground improvement method that prestrains and prestresses the so